(714) 617-8600
2 Corporate Park, Suite 110
Irvine, CA 92606

Beckman Business Center

Project Category:

Industrial

Location:

Fullerton, California

Seven industrial buildings built around the existing office headquarters of the Beckman Coulter facility. Due to the existing building’s historic nature, Bastien and Associates, Inc. was asked to design the industrial buildings in a style similar to the original. The new buildings use horizontal glass and canopy elements broken by a vertical tower. The entry canopies have a similar profile as the existing building and the horizontal window mullions are enhanced with a shadow line to reinforce the horizontal nature.

Total Building Area: 978,665 s.f.
Site Area: 44.29 acres

Construction Completed in January, 2019

Kirkwood