The experience of a design firm plays a great part in the success of a project both from functional and economic standpoints. Bastien’s broad experience has contributed to an indispensible knowledge-base in our firm which is constantly shared by staff members to bring about the most informed project decisions.
Design and planning are WHAT we do. Knowledgeable leadership, insightful experience, and creative problem solving are HOW we accomplish our goals and keep them aligned with the goals of our clients.
NBC Universal Barham, an expansion of Universal Studios Lower Lot, includes eight state of the art sound stages totaling more
The first two new stages to be built on the NBCUniversal lot in nearly 40 years have replaced smaller, outdated
Ciudad de la Luz (City of Light) is an $88 million full-feature film studio on the Mediterranean that quickly set
New England Studios is a new, tilt-up concrete, full-service motion-picture studio located half an hour outside of Boston. Master planned
First Southern California studio built from the ground up in 60 years. Phase I & II sound stages and production
The film school emulates Hollywood working conditions in an educational environment. The facilities include Hollywood-style soundstages, TV, foley and motion
Designed by Bastien and Associates, Inc., St. Margaret’s new Performing Arts Center has received high praise from the school, the
This new venue in its beautiful Denver setting rates an "A" grade from the music critics! The project, with lead
Expansion of bar and food service amenities within the building and prefunction plaza areas as well as a second stage
A 250-seat live performance venue in the heart of Hollywood. Envisioned to hold amateur singing competitions on a weekly basis
A key component in the redesigned campus masterplan, The Center for Music and Performing Arts will frame the entry into
“In all my years working on amphitheaters, this is the most beautiful plan I have ever seen developed! The folks
Designed by Bastien and Associates, Inc., St. Margaret’s new Performing Arts Center has received high praise from the school, the
In 2015, St. Margaret's completed construction on Phase II of their northern campus renovations. This work included a new 2-story
The film school emulates Hollywood working conditions in an educational environment. The facilities include Hollywood-style soundstages, TV, foley and motion
The school of Film and Media Arts is located in Cleveland's historic Playhouse Square in the top floor the Idea
36,000 s.f. Tenant Improvement over two floors for Henry Mayo Newhall Memorial Hospital. The third floor was fully built out
Film Makers Village was designed by Bastien and Associates, Inc. as the third phase of the Film School’s Campus. The
Located at the corner of San Michele Road and Perris Boulevard in the industrial core of Moreno Valley. Built for
Phase I of a multi-block industrial complex developed by Western Realco in North Orange County. This first phase consisted of a single,
Building on the success of the recently completed project at Saturn and Orbitier, Bastien and Associates, Inc. has once again partnered
Seven industrial buildings built around the existing office headquarters of the Beckman Coulter facility. Due to the existing building’s historic
Single, industrial, tilt-up building built in the northern industrial corridor of Fullerton. Construction completed in 2017.
A single, concrete tilt-up, industrial building tucked into the hillside along Birch Street. The fifth building to be built by
The five-story building spans the main studio access road and has direct views to the Mediterranean. It shares the special
A two story, high-end headquarters, tenant improvement including office and manufacturing spaces built within Building 1 at the Saturn and
36,000 s.f. Tenant Improvement over two floors for Henry Mayo Newhall Memorial Hospital. The third floor was fully built out
Three story multi-tenant office building with over-under parking garage, feature lobby, interiors.
2-story concrete tilt-up office building with glazed rotunda at street intersection.
Phase 2 involved the construction of new product assembly clean rooms, laboratories, warehouse area and site work to add chillers,